This study is following the Class Environmental Assessment (EA) for Provincial Transportation Facilities (2000) process for ‘Group B’ projects.
Throughout the study process, input will be sought from the public and external agencies. This consultation will help identify existing conditions and constraints, facilitate the review of the previously approved EA plan, and inform the development of the detail design.
As part of the study, one (1) Public Information Centre (PIC) is anticipated to be held in the Spring 2027 to provide project information and gather feedback. The study will also include a federal Environmental Effects Evaluation (EEE) to support federal review and approval requirements associated with the proposed works in and around the Rideau Canal. Upon completion of the Detail Design Study, a Design and Construction Report (DCR) will be prepared to document the project’s design, environmental considerations and mitigation measures, and proposed construction activities.
A summary of the study schedule and consultation process is shown in the flowchart detailed below.