Project History

A Preliminary Design and Transportation Environmental Study Report (TESR) was completed for the Ottawa Queensway Downtown Bridges from Metcalfe Street to Main Street (GWP 4170-13-00). The preliminary design study evaluated rehabilitation and replacement alternatives for seven bridge structures along Highway 417 in downtown Ottawa, including the Rideau Canal Bridges. Technically Preferred Alternatives (TPA) were selected based on consultation with agencies, stakeholders, Indigenous Communities, and the public.

Feedback received during Preliminary Design helped to inform the development of and further refinement of the TPA, as documented in the TESR. The seven structures included crossings at the following locations throughout Ottawa’s downtown core:

  • Metcalfe Street
  • Elgin Street
  • The Rideau Canal
  •  Main Street

Particular emphasis was placed on the Rideau Canal Bridges due to their location spanning the Rideau Canal, a National Historic Site and UNESCO World Heritage Site that is of significant importance to tourism and active transportation in Ottawa. Throughout the Preliminary Design evaluation process, a replacement alternative was identified as the preferred solution for the Rideau Canal Bridges which includes a new bridge design that was developed in consultation with Parks Canada, the National Capital Commission (NCC), stakeholders, Indigenous Communities and the public.

Between 2017 (project commencement) and 2024 (project completion), the project underwent extensive consultation and engagement through three Public Information Centres (PICs), meetings with agencies and advisory committees, Indigenous Communities and stakeholder outreach.

Feedback received through the Preliminary Design consultation process influenced refinements to the Rideau Canal Bridge TPA. These refinements included adjustments to pier locations to avoid conflicts with buried utilities as well as continuing to address the heritage and environmental considerations associated with the Rideau Canal, a National Historic  Site and UNESCO World Heritage Site.

Key Preliminary Design documentation is linked below:

  • Transportation Environmental Study Report (TESR) (2024)
  • TESR Volume 1 Appendices
  • Link to TESR Volume 2 Appendices